Physical guarantee

How much energy can a project use in contracts?

● checked against the primary source on Oct 6, 2026Source: Presidency of the Republic

Acronyms: EPE, Energy Research Office; MRE, Energy Reallocation Mechanism; CCEE, Electric Energy Trading Chamber; GSF, Generation Scaling Factor, the MRE adjustment factor.

In one sentence

Maximum amount of energy of a generation project, defined by the Ministry of Mines and Energy, that can be used to prove load coverage or for trading through contracts.

Real example

Number read from the published database

In Aug 2026, the MRE plants generated 40,397 MWavgNature of the data: Calculated against a physical guarantee modulated and adjusted by the availability factor of 51,185 MWavgNature of the data: Calculated: in the month, they generated less than the physical guarantee. The ratio between the two is the GSF published in the panel.

No Check this number record of its own in this example: the number comes from the panel's published database, which carries the source and the reference date.

Calculated: Deterministic transformation made by Scrutiniums, with a published formula.

Why it matters

The Decree requires selling agents to have backing for one hundred percent of their contracts, and this backing is the physical guarantee of their own or third-party projects; it is reviewed periodically and calculated by the EPE.

How it is measured

In the observatory, the physical guarantee of the MRE plants appears in average MW in the CCEE datasets, modulated and adjusted by the availability factor, as the denominator of the GSF; that of each plant is not published here.

Unit: average MW

Not to be confused with

  • MRE (Energy Reallocation Mechanism)

    Physical guarantee is an energy limit of each project; the MRE is the mechanism through which hydropower plants share hydrological risk, and it does not define anyone's physical guarantee (see MRE).

  • Verified generation

    Physical guarantee is not generation: the plant might generate more or less than it each month.

  • GSF (Generation Scaling Factor (MRE adjustment factor))

    The GSF compares, month by month, the generation of the MRE plants with their physical guarantee. A GSF below 100% says that generation was below the physical guarantee, not that the physical guarantee fell (see GSF).

What cannot be concluded

  • Physical guarantee is not generation: the plant might generate more or less than it each month, and it is this difference, across the MRE hydropower plants, that the GSF measures.