How do planning models represent hydropower plants?

● checked against the primary source on Oct 7, 2026◐ with caveat: no formal definition in the sources consultedSource: EPE, MME and ONS

Acronyms: ONS, National Electric System Operator; CCEE, Electric Energy Trading Chamber; MME, Ministry of Mines and Energy; ANEEL, Brazilian Electricity Regulatory Agency; EPE, Energy Research Office; PLD, Settlement Price for Differences (spot price).

In one sentence

In plain words

In the official operation planning models, hydropower plants do not appear one by one: those of each group of river basins are grouped into a single equivalent energy reservoir. The topology the EPE describes has 12 REE, in use since the Monthly Operation Program of January 2018.

Source text

Aggregated representation of hydropower plants in the official operation planning models, organized according to the river basins where the plants are located.

Real example

Number read from the published database

On Sep 29, 2026, the ONS published the stored energy of 12 REENature of the data: Calculated. Among the 11 that have storage (REE Itaipu has no storage, and therefore no percentage), the EAR ranged from 26.1% of the maximum EAR in REE Madeira to 86.2% in REE SulNature of the data: Observed: each REE has its own perimeter and its own maximum EAR. The link opens the panel on the REE with the lowest EAR.

No Check this number record of its own in this example: the number comes from the panel's published database, which carries the source and the reference date.

Calculated: Deterministic transformation made by Scrutiniums, with a published formula. Observed: Value published directly by the official or primary source.

Why it matters

With the REE, the ONS publishes how much energy is stored and how much arrives as inflow in each group of basins, and not only in the subsystem total. The ONS publishes stored energy (EAR) and natural inflow energy (ENA) by REE. The report of the Price Formation Mechanisms working group (GT, coordinated by the CCEE, with the MME, ANEEL, EPE and ONS) records that the number of REE in the models rose from 4 to 12 and, among the improvements under development in 2019, the monthly spatial correlation of inflows between the REE, to capture the hydrological diversity between basins; whether this correlation is already in use was not checked.

How it is measured

It is not a quantity: it is the unit in which the ONS publishes the daily EAR and ENA. EAR is the energy associated with the volume of water available in the reservoirs that can be converted into generation at the plant itself and at all plants downstream in the cascade. In the observatory, EAR by REE appears in MWmonth and as a percentage of the maximum EAR, each REE with its own perimeter and its own maximum EAR.

Not to be confused with

  • EAR (Stored energy)

    EAR is the energy associated with stored water; the REE is one of the cuts in which the ONS publishes it, alongside the subsystem, the basin and the reservoir. Each cut has its own perimeter and its own maximum EAR.

  • Subsystem

    The topology described by the EPE has 4 interconnected subsystems and 12 REE: they are different cuts, and the REE aggregates hydropower plants according to the river basin.

What cannot be concluded

  • None of the documents consulted gives a formal definition of REE: the description above is the EPE's, and the composition of each of the 12 REE in plants is not in this entry. Submodules 2.4, 4.3 and 4.5 of the Grid Procedures, read for the PLD module, do not contain the term; the other submodules and the ONS glossary were not read, and the data dictionary of the “EAR Diário por REE” dataset uses the term without defining it.
  • The GT report describes the increase from 4 to 12 REE without dating it. In the ONS files, the panel detects the reconfiguration of Dec 29 and 30, 2017, from 9 to 12 REE, which changed the perimeter of some of them, and the EPE records topology G, with 12 REE, in use since the Monthly Operation Program of January 2018. Series by REE before this change are not comparable on the same perimeter.

Related entries

  • EARStored energyThe ONS publishes stored energy by REE, each with its own perimeter and its own maximum EAR.
  • ENANatural inflow energyThe ONS publishes natural inflow energy by REE.
  • NEWAVEThe EPE records the 12-REE topology together with version 24 of the NEWAVE model, from the PMO of January 2018.